April 25, 2007 Justin Chin

Marathon Day 22 – Nuts and Bolts

Been adding in the details that bring out the believability in the design of the landing gear. Almost done.

wing_gear_05.jpgwing_gear_06.jpg

Main landing gear to do list: 

  • Build out the connection points to the wing.
  • Add more bolts.

To finish this phase of the wing I need to:

  • Build the front landing gear
  • Build out cargo ramp
  • Build out flaps
  • Block out basic interior cockpit and cargo space (saving the details for later)

After all that is done I can move on to other things.